Current Construction Projects

mapScope: The project consists of two lighted synthetic sports fields, one with a rubber track.  The project includes bleachers and scoreboards as well as fencing, gates and pathways.

Completion anticipated by 2020 graduation

Current Project Documents:

Corona del Mar Sports Field Project Fact Sheet (revised 10/17/2017)

Final Environmental Impact Report (October 2017)

Recirculated Draft Environmental Impact Report (August 2017)

* Please note:  Hard copies of the RDEIR will not be provided. You may download a copy from the link above, or come in to the District Office or the CdMHS Administration Office to view a copy.

Archived Project Documents:

Initial Study (February 2016)

Recirculated Initial Study (March 2016)

Notice of Availability of the Draft Environmental Impact Report*

Draft Environmental Impact Report (February 2017)

Notice of Improvement (September 13, 2017 - Information Meeting) 

* Please note:  Hard copies of the DEIR will not be provided. You may download a copy from the link above, or come in to the District Office or CdMHS Administration Office to view a copy.

Corona del Mar Fence Rendering

Beginning the week of February 17, 2020 construction will begin to replace the existing six-foot chain-link along Mar Vista Drive and Vista Del Oro with a new, permanent eight-foot chain-link fence. Trees along this section will also be removed, however they will be replaced upon completion of construction. 

Additional enhancements expected to begin construction this summer include and will be completed by the start of the 2020/2021 school year, include:

  • Installation of permanent fencing along the perimeter of the school. 

    • Some sections will continue to be chain link fencing, while other sections (front entrance to the high school, student parking lot - adjacent to the pool and Learning Resource Center (LRC), and parts of the fencing near the baseball field/middle school entrance) will have ornamental fencing. 

  • Construction of new sidewalks throughout the campus to allow for pedestrian traffic within the interior and exterior of fence perimeter. 

  • Reconfiguration of the school bus pick-up/drop-off along Mar Vista Drive to allow construction of additional sidewalks.

  • Reconfiguration of the student parking lot near the pool and LRC for accessibility enhancements.

  • Construction of a new entry structure at the athletic entrance adjacent to the pool and LRC.

It is anticipated that existing walkways and access to school parking lots will not be impacted during the school year. 

Community Meeting 9/23/19 - CDMHS Lecture Hall, 6:00 pm

Community Meeting 9/23/19 - Presentation

Board Meeting 12-11-18 - Presentation

pool

poolProject Description:

Project includes infill of the existing Estancia High School pool and installation of a new 50 meter pool and support facilities.  The project will be phased into two increments.  The first increment will contain the pool only.  The second increment will be the supporting tenant improvements for the locker rooms, new team rooms and athletic support spaces.

Increment 1 is in construction nearing project completion.  Upon completion Increment 1 will be turned over for use while Increment 2 continues construction.  Work is anticipated to be complete for Increment two during the second semester for the 2019-2020 school year.

Community Meeting 4/29/19 - EHS Library, 6:00 pm

Floor Plan Sheet

Planning continues on a new theater for Estancia High School.  The District has selected Pfeiffer partners as the Architect for the project.  The project scope includes a new ~350 seat theater, black box, lobby and support spaces.  Currently the project is completing the Design Development phase and moving into design of Construction Documents.  

 

Upcoming Community Meeting 3/16/20 - Ensign Library, 6:00 pm

Ensign Rendering

map

Ensign Schematic - School Fencing and Parking Lot

The project includes a variety of construction upgrades, including replacement of temporary fencing with permanent fencing, additional parking lots, reconfiguration of existing parking lot, and remodel of the front office to improve visibility and access. Construction will begin the week of February 17, 2020. It is anticipated that existing walkways and the current school parking lot will not be impacted during the school year.

Project Overview:

  • Construction of a new pick-up/drop-off lot at the front of the school. This front lot, as some have called the “banana lot”, includes a one-way drop-off/pick-up lane which minimizes traffic congestion on City streets, and approximately 20 parking spaces.

  • Construction of an additional parking lot will along Irvine Avenue to accommodate approximately 45 parking spaces. 

As part of the project, several trees will be removed to accommodate construction, some trees will remain and additional trees will be planted throughout the school.

Reconstruction of the existing parking lot and front office remodel will not begin until the summer, with all construction expected to be complete by the start of the 2020/2021 school year. 

Community Meeting 9/24/19 - Ensign Library, 6:00 pm

Community Meeting 9/24/19 - Ensign Library, 6:00 pm (Spanish)

Community Meeting 9/24/19 - Presentation

Board Meeting 12-11-18 - Presentation

Currently the district is working on a modernization of the Newport Harbor High School Kiln area.

Project Description:

Heating, Ventilation and Air Conditioning (HVAC) projects include the complete replacement of systems at various schools.

HVAC UnitBelow is the Newport-Mesa Unified School District's anticipated phased-in plan for installing Heating, Ventilation and Air Conditioning (HVAC) in all schools and district facilities. 

Please note that the following schedule is tentative and subject to change due to varying unforeseen factors.

HVAC Anticipated Schedule
SCHOOL HVAC NOTES
California Yes Completed Summer 2015
TeWinkle Yes Completed Summer 2015
Killybrooke Yes Completed Summer 2015
Early College HS Yes Completed as part of modernization in 2016
Paularino Yes Completed Summer 2016
Sonora Yes Completed Summer 2016
Adams Yes Completed Summer 2016
Victoria Yes Had HVAC prior to projects
Rea Yes Had HVAC prior to projects
Eastbluff Yes Had HVAC prior to projects
Andersen Yes Had HVAC prior to projects
Lincoln Yes Had HVAC prior to projects
Newport Coast Yes Had HVAC prior to projects
Estancia HS Yes Had HVAC prior to projects
Corona del Mar MS/HS Anticipated Completion 2020 Partial HVAC; full HVAC anticipated 2020
Davis Magnet Yes Completed Summer 2018
College Park Yes Completed Summer 2018
Wilson Yes Completed Summer 2018
Pomona Yes Completed Summer 2018
Kaiser Yes Completed Summer 2018
Woodland Yes Completed Summer 2018
Whittier Yes Completed Summer 2019
Mariners Yes Completed Summer 2019
Newport Heights Yes Completed Summer 2019
Ensign Yes Completed Summer 2019
Newport El Yes Completed Summer 2019
Harbor View Yes Completed Summer 2019
Back Bay HS Yes Completed Summer 2019
Costa Mesa MS/HS Anticipated Completion 2020 Partial HVAC; full HVAC anticipated 2020
Newport Harbor HS Anticipated Completion 2020 Partial HVAC; full HVAC anticipated 2020

 

*Please find Community Meeting notices and presentations below

Contact Us

Ara Zareczny
Director, Facilities Development, Planning and Design
azareczny@nmusd.us
714-424-7522

Lori Horrell
Administrative Assistant
lhorrell@nmusd.us
714-424-8934

Steve Morris
Facilities Planning Coordinator
smorris@nmusd.us
714-679-9891

Mark Manstof
Facilities Analyst
mmanstof@nmusd.us
714-424-7567