Completed Projects

General Information

Mariners elementary - Admin. Fence

Mariners Admin. Fence Project

Project completed in 2018 as scheduled.

newport heights elementary - admin-fence

Newport Heights Elementary Admin. Fence Project

Project completed in 2018 as scheduled.

Wilson Elementary - Admin-Fence

Project completed in 2018 as scheduled.

Corona Del Mar - Baseball Backstop

Project Overview:
Completed Winter 2017-2018.

Construction consisted of replacing and relocating existing baseball backstop to prevent stray foul balls from leaving the playing field.

Project Documents:

Notice Of Improvement (March 6, 2017 - Information Meeting)

Corona del Mar - Enclave

CdM Enclave

Corona del Mar - Front Entry

CdM Entry Fin Wall

Corona del Mar - Learning Resource Center

Project Description:

The CdM LRC includes a more open floor plan with collaborative and tech spaces. It also includes (3) small study rooms and (1) large study room. The design intent was to provide a more collegiate feel to the space. This project was jointly funded by the CdM Foundation and District funds.  

Corona del Mar - Locker Restoration

CdM Lockers
Project Description:

PTA funded project included maintenance and restoration of existing lockers around the CdM quad.

Corona del Mar - Marian Bergeson Aquatic Center

Marian Bergeson Aquatic Center Plaque

Corona del Mar - Theater

CdM Theater Entry

Corona del Mar - Weight Room

CdM Weight Room Interior

Costa Mesa High School - Aquatic Center

CMHS Aquatic Center at Sunset

Costa Mesa High School - Clock Tower

CMHS Clock Tower Aerial

Costa Mesa High School - Enclave

Enclave Entry at Night

Costa Mesa High School - Enclave Lunch Area

Lunch area shade structure

Costa Mesa High School - Gym Renovation

CMHS Mustangs Logo
Project Description:

In anticipation of the 2017 State of the Schools, CMHS received a refresh of its existing gym.  Upgrades included flooring finish, new AV, and a divider curtain.  

Costa Mesa High School - Mustangs Field

Mustangs Field 50 Yard Line

Costa Mesa High School - Softball Scoreboard

Costa Mesa High School - Softball Batting Cage

Costa Mesa High School - Theater

Theater Screen Wall

Costa Mesa High School - Project Lead The Way

CMHS Project Lead the Way
Project Description:

To accommodate the PLTW curriculum alternations are required for the existing building W.  These upgrades include an opening the floor plate with enhanced power and data for curriculum requirements.  Project anticipated to start Summer 2017.

Estancia High School - Classroom Storefront

EHS Classroom EnclosureProject Description:

Project includes replacement of existing classroom entry gates with storefront glass system.  Construction has started and will be completed prior to the 17-18 school year.

Estancia High School - Jim Scott Staidum

Jim Scott Staidum

Newport Harbor High School - Davidson Field

Davidson Field Aerial

Newport Harbor High School - Gym

NHHS Gym Floor

Newport Harbor High School - Robins Loats

NHHS Tower

Newport Harbor High School - Softball Scoreboard

Tewinkle - Gym

Tewinkle Gym at Night

Contact Us

Ara Zareczny
Director, Facilities Development, Planning and Design
azareczny@nmusd.us
714-424-7522

Flavia Mendez
Administrative Assistant
fmendez@nmusd.us
714-424-8934

Steve Morris
Facilities Planning Coordinator
smorris@nmusd.us
714-679-9891

Mark Manstof
Facilities Analyst
mmanstof@nmusd.us
714-424-7567